Unha vez finalizados os concursos de vendas convocados,as parcelas vacantes dos devanditos concursos poderán adquirirse mediante adxudicación directa.
| PARQUE EMPRESARIAL | PROVINCIA | FASE | Nº PARCELA | USO | PROMOTOR | SUPERFICIE (m²) | PREZO BASE (€) | €/m² | PREZO VENTA (€) | €/m² |
|---|---|---|---|---|---|---|---|---|---|---|
| P.E. A Reigosa (Pontecaldelas) | Pontevedra | FASE 1 | P-024 | Industrial-comercial | Xestur | 6.797,83 | 645.793,88 | 95,00 | * 452.055,70 | * 66,50 |
| P.E. A Reigosa (Pontecaldelas) | Pontevedra | FASE 1 | P-025 | Industrial-comercial | Xestur | 4.605,47 | 437.519,66 | 95,00 | * 306.263,76 | * 66,50 |
| P.E. A Reigosa (Pontecaldelas) | Pontevedra | FASE 1 | P-034 | Industrial-comercial | Xestur | 2.721,01 | 208.619,84 | 76,67 | * 146.034,00 | * 53,67 |
| P.E. A Reigosa (Pontecaldelas) | Pontevedra | FASE 1 | P-048 | Industrial-comercial | Xestur | 9.186,29 | 918.629,00 | 100,00 | * 643.040,30 | * 70,00 |
| P.E. A Reigosa (Pontecaldelas) | Pontevedra | FASE 1 | P-07 | Industrial-comercial | Xestur | 19.993,37 | 1.899.370,13 | 95,00 | * 1.329.559,11 | * 66,50 |
| P.E. A Reigosa (Pontecaldelas) | Pontevedra | FASE 1 | P-08 | Industrial-comercial | Xestur | 21.529,23 | 2.045.276,88 | 95,00 | * 1.431.693,80 | * 66,50 |
| P.E. A Reigosa (Pontecaldelas) | Pontevedra | FASE 1 | P-50 | Industrial-comercial | Xestur | 10.320,62 | 1.032.062,00 | 100,00 | * 722.443,40 | * 70,00 |
| P.E. A Sionlla | A Coruña | FASE 1 | D4B01A | Industrial | Xestur | 14.120,00 | 1.623.800,00 | 115,00 | * 1.136.660,00 | * 80,50 |
| P.E. A Sionlla | A Coruña | FASE 1 | D4B01A-2 | Industrial | Xestur | 8.713,00 | 1.001.995,00 | 115,00 | * 701.396,50 | * 80,50 |
| P.E. A Sionlla | A Coruña | FASE 1 | D4B01A-3 | Industrial | Xestur | 8.099,00 | 931.385,00 | 115,00 | * 651.969,50 | * 80,50 |
| P.E. A Sionlla | A Coruña | FASE 1 | D4B01B | Industrial | Xestur | 6.853,00 | 788.095,00 | 115,00 | * 551.666,50 | * 80,50 |
| P.E. A Sionlla | A Coruña | FASE 1 | D4B01C | Industrial | Xestur | 6.825,00 | 784.875,00 | 115,00 | * 549.412,50 | * 80,50 |
| P.E. A Sionlla | A Coruña | FASE 1 | D4B01D | Industrial | Xestur | 6.918,00 | 795.570,00 | 115,00 | * 556.899,00 | * 80,50 |
| P.E. A Sionlla | A Coruña | FASE 1 | D4B01E | Industrial | Xestur | 12.270,00 | 1.411.050,00 | 115,00 | * 987.735,00 | * 80,50 |
| P.E. Alvedro | A Coruña | FASE 1 | EQ-S | Equipamiento social | Igvs | 4.700,00 | 38.845,50 | 8,27 | * 27.191,85 | * 5,79 |
| P.E. Arbo | Pontevedra | FASE 2 | 21 | Industrial-comercial | Xestur | 1.038,00 | 72.660,00 | 70,00 | * 36.330,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 22 | Industrial-comercial | Xestur | 1.037,00 | 72.590,00 | 70,00 | * 36.295,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 23 | Industrial-comercial | Xestur | 1.056,00 | 73.920,00 | 70,00 | * 36.960,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 24 | Industrial-comercial | Xestur | 996,00 | 69.720,00 | 70,00 | * 34.860,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 25 | Industrial-comercial | Xestur | 1.055,00 | 73.850,00 | 70,00 | * 36.925,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 30 | Industrial-comercial | Xestur | 1.104,00 | 77.280,00 | 70,00 | * 38.640,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 31 | Industrial-comercial | Xestur | 1.702,00 | 119.140,00 | 70,00 | * 59.570,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 32 | Industrial-comercial | Xestur | 1.218,00 | 85.260,00 | 70,00 | * 42.630,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 33 | Industrial-comercial | Xestur | 1.341,00 | 93.870,00 | 70,00 | * 46.935,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 34 | Industrial-comercial | Xestur | 1.349,00 | 94.430,00 | 70,00 | * 47.215,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 35 | Industrial-comercial | Xestur | 1.261,00 | 88.270,00 | 70,00 | * 44.135,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 36 | Industrial-comercial | Xestur | 1.347,00 | 94.290,00 | 70,00 | * 47.145,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 2 | 37 | Industrial-comercial | Xestur | 1.282,00 | 89.740,00 | 70,00 | * 44.870,00 | * 35,00 |
| P.E. Arbo | Pontevedra | FASE 1 | EQ-C | Equipamiento publico | Xestur | 879,10 | 52.746,00 | 60,00 | * 26.373,00 | * 30,00 |
| P.E. Arbo | Pontevedra | FASE 1 | EQ-S | Equipamiento publico | Xestur | 879,10 | 52.746,00 | 60,00 | * 26.373,00 | * 30,00 |
| P.E. Arteixo | A Coruña | FASE A | A-01 | Industrial-terciario | Xestur | 2.171,00 | 384.267,00 | 177,00 | * 268.986,90 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | A-04 | Industrial-terciario | Xestur | 1.700,00 | 300.900,00 | 177,00 | * 210.630,00 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | C-10 | Industrial-terciario | Xestur | 1.920,00 | 339.840,00 | 177,00 | * 237.888,00 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | C-11 | Industrial-terciario | Xestur | 1.920,00 | 339.840,00 | 177,00 | * 237.888,00 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | D-02 | Industrial-terciario | Xestur | 1.500,00 | 265.500,00 | 177,00 | * 185.850,00 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | D-03 | Industrial-terciario | Xestur | 1.487,00 | 263.199,00 | 177,00 | * 184.239,30 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | D-05 | Industrial-terciario | Xestur | 1.500,00 | 265.500,00 | 177,00 | * 185.850,00 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | D-06 | Industrial-terciario | Xestur | 1.500,00 | 265.500,00 | 177,00 | * 185.850,00 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | D-07 | Industrial-terciario | Xestur | 1.500,00 | 265.500,00 | 177,00 | * 185.850,00 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | D-08 | Industrial-terciario | Xestur | 2.750,00 | 514.250,00 | 187,00 | * 359.975,00 | * 130,90 |
| P.E. Arteixo | A Coruña | FASE A | D-09 | Industrial-terciario | Xestur | 3.086,00 | 577.082,00 | 187,00 | * 403.957,40 | * 130,90 |
| P.E. Arteixo | A Coruña | FASE A | E-07 | Industrial-terciario | Xestur | 2.000,00 | 354.000,00 | 177,00 | * 247.800,00 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | E-08 | Industrial-terciario | Xestur | 1.987,00 | 351.699,00 | 177,00 | * 246.189,30 | * 123,90 |
| P.E. Arteixo | A Coruña | FASE A | E-09 | Industrial-terciario | Xestur | 3.452,00 | 625.502,38 | 181,20 | * 437.851,68 | * 126,84 |
| P.E. Arteixo | A Coruña | FASE A | J-08C | Industrial-terciario | Xestur | 3.502,00 | 455.260,00 | 130,00 | * 318.682,00 | * 91,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0201 | Industrial-terciario | Xestur | 1.357,00 | 261.707,14 | 192,86 | * 183.195,00 | * 135,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0202 | Industrial-terciario | Xestur | 1.500,00 | 289.285,72 | 192,86 | * 202.500,00 | * 135,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0203 | Industrial-terciario | Xestur | 1.500,00 | 289.285,72 | 192,86 | * 202.500,00 | * 135,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0204 | Industrial-terciario | Xestur | 1.500,00 | 289.285,72 | 192,86 | * 202.500,00 | * 135,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0205 | Industrial-terciario | Xestur | 1.500,00 | 289.285,72 | 192,86 | * 202.500,00 | * 135,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0206 | Industrial-terciario | Xestur | 1.500,00 | 289.285,72 | 192,86 | * 202.500,00 | * 135,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0207 | Industrial-terciario | Xestur | 1.475,00 | 284.464,28 | 192,86 | * 199.125,00 | * 135,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0208 | Industrial-terciario | Xestur | 3.582,00 | 690.814,31 | 192,86 | * 483.570,00 | * 135,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0209 | Industrial-terciario | Xestur | 1.801,00 | 321.607,13 | 178,57 | * 225.125,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0210 | Industrial-terciario | Xestur | 1.155,00 | 206.250,00 | 178,57 | * 144.375,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0211 | Industrial-terciario | Xestur | 1.045,00 | 186.607,14 | 178,57 | * 130.625,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0212 | Industrial-terciario | Xestur | 1.155,00 | 206.250,00 | 178,57 | * 144.375,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0213 | Industrial-terciario | Xestur | 1.032,00 | 184.285,70 | 178,57 | * 129.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0214 | Industrial-terciario | Xestur | 1.045,00 | 186.607,14 | 178,57 | * 130.625,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0215 | Industrial-terciario | Xestur | 1.155,00 | 206.250,00 | 178,57 | * 144.375,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0216 | Industrial-terciario | Xestur | 1.045,00 | 186.607,14 | 178,57 | * 130.625,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0217 | Industrial-terciario | Xestur | 1.155,00 | 206.250,00 | 178,57 | * 144.375,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0218 | Industrial-terciario | Xestur | 1.100,00 | 196.428,56 | 178,57 | * 137.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0219 | Industrial-terciario | Xestur | 1.045,00 | 186.607,14 | 178,57 | * 130.625,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0220 | Industrial-terciario | Xestur | 1.155,00 | 206.250,00 | 178,57 | * 144.375,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0221 | Industrial-terciario | Xestur | 1.045,00 | 186.607,14 | 178,57 | * 130.625,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0222 | Industrial-terciario | Xestur | 1.155,00 | 206.250,00 | 178,57 | * 144.375,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0223 | Industrial-terciario | Xestur | 1.100,00 | 196.428,56 | 178,57 | * 137.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0224 | Industrial-terciario | Xestur | 1.045,00 | 186.607,14 | 178,57 | * 130.625,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0225 | Industrial-terciario | Xestur | 5.172,00 | 886.628,56 | 171,43 | * 620.640,00 | * 120,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0226 | Industrial-terciario | Xestur | 1.353,00 | 241.607,14 | 178,57 | * 169.125,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0227 | Industrial-terciario | Xestur | 1.350,00 | 241.071,44 | 178,57 | * 168.750,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0228 | Industrial-terciario | Xestur | 1.363,00 | 243.392,86 | 178,57 | * 170.375,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0229 | Industrial-terciario | Xestur | 7.945,00 | 1.362.000,00 | 171,43 | * 953.400,00 | * 120,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0230 | Industrial-terciario | Xestur | 2.700,00 | 462.857,13 | 171,43 | * 324.000,00 | * 120,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0231 | Industrial-terciario | Xestur | 2.700,00 | 462.857,13 | 171,43 | * 324.000,00 | * 120,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0232 | Industrial-terciario | Xestur | 2.700,00 | 462.857,13 | 171,43 | * 324.000,00 | * 120,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0233 | Industrial-terciario | Xestur | 2.700,00 | 462.857,13 | 171,43 | * 324.000,00 | * 120,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0234-0235 | Industrial-terciario | Xestur | 4.169,00 | 714.685,69 | 171,43 | * 500.280,00 | * 120,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0236-0237 | Industrial-terciario | Xestur | 1.561,00 | 278.750,00 | 178,57 | * 195.125,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0238-0239 | Industrial-terciario | Xestur | 1.350,00 | 241.071,42 | 178,57 | * 168.750,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0240-0241 | Industrial-terciario | Xestur | 1.516,00 | 270.714,28 | 178,57 | * 189.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0242 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0243 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0244 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0245 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0246 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0247 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0248 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0249 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0250 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0251 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0252 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0253 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0254 | Industrial-terciario | Xestur | 1.000,00 | 178.571,44 | 178,57 | * 125.000,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0255 | Industrial-terciario | Xestur | 1.566,00 | 279.642,88 | 178,57 | * 195.750,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0256 | Industrial-terciario | Xestur | 1.610,00 | 287.500,00 | 178,57 | * 201.250,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0257 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0258 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0259 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0260 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0261 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0262 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0263 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0264 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0265 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0266 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0267 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0268 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arteixo | A Coruña | FASE C | K-0269 | Industrial-terciario | Xestur | 1.020,00 | 182.142,86 | 178,57 | * 127.500,00 | * 125,00 |
| P.E. Arzua | A Coruña | FASE 2 | ECS | Equ-comercial-social | Xestur | 2.011,00 | 120.660,00 | 60,00 | * 84.462,00 | * 42,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | I4 | Mixto | Xestur | 15.342,00 | 1.917.750,00 | 125,00 | * 958.875,00 | * 62,50 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | J3.1 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | J3.2 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | J3.3 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | J3.A | Mixto | Xestur | 2.371,00 | 367.505,00 | 155,00 | * 183.752,50 | * 77,50 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | L1.1 | Terciario | Xestur | 12.993,00 | 1.624.125,00 | 125,00 | * 812.062,50 | * 62,50 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | L1.2 | Mixto | Xestur | 13.138,00 | 1.642.250,00 | 125,00 | * 821.125,00 | * 62,50 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L3.1 | Mixto | Xestur | 3.432,00 | 480.480,00 | 140,00 | * 240.240,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L3.2 | Mixto | Xestur | 3.432,00 | 480.480,00 | 140,00 | * 240.240,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L3.3 | Mixto | Xestur | 3.432,00 | 480.480,00 | 140,00 | * 240.240,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L3.4 | Mixto | Xestur | 3.431,00 | 480.340,00 | 140,00 | * 240.170,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L3.5 | Mixto | Xestur | 3.431,00 | 480.340,00 | 140,00 | * 240.170,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L4.1 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L4.2 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L4.3 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | L4.A | Mixto | Xestur | 2.352,00 | 364.560,00 | 155,00 | * 182.280,00 | * 77,50 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | M2.1 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | M2.2 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | M2.3 | Mixto | Xestur | 1.200,00 | 168.000,00 | 140,00 | * 84.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE V | M2.A | Mixto | Xestur | 2.372,00 | 367.660,00 | 155,00 | * 183.830,00 | * 77,50 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | M3.1 | Mixto | Xestur | 2.701,00 | 378.140,00 | 140,00 | * 189.070,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | M3.2 | Mixto | Xestur | 2.700,00 | 378.000,00 | 140,00 | * 189.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | M3.3 | Mixto | Xestur | 2.700,00 | 378.000,00 | 140,00 | * 189.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | M3.4 | Mixto | Xestur | 2.701,00 | 378.140,00 | 140,00 | * 189.070,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | M3.5 | Mixto | Xestur | 2.700,00 | 378.000,00 | 140,00 | * 189.000,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | M3.6 | Mixto | Xestur | 2.701,00 | 378.140,00 | 140,00 | * 189.070,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.1 | Mixto | Xestur | 985,00 | 137.900,00 | 140,00 | * 68.950,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.2 | Mixto | Xestur | 945,00 | 132.300,00 | 140,00 | * 66.150,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.3 | Mixto | Xestur | 945,00 | 132.300,00 | 140,00 | * 66.150,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.4 | Mixto | Xestur | 945,00 | 132.300,00 | 140,00 | * 66.150,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.5 | Mixto | Xestur | 945,00 | 132.300,00 | 140,00 | * 66.150,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.6 | Mixto | Xestur | 944,00 | 132.160,00 | 140,00 | * 66.080,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.7 | Mixto | Xestur | 944,00 | 132.160,00 | 140,00 | * 66.080,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.8 | Mixto | Xestur | 944,00 | 132.160,00 | 140,00 | * 66.080,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P1.9 | Mixto | Xestur | 981,00 | 137.340,00 | 140,00 | * 68.670,00 | * 70,00 |
| P.E. As Gandaras (Lugo) | Lugo | FASE IV | P3.A | Mixto | Xestur | 2.350,00 | 364.250,00 | 155,00 | * 182.125,00 | * 77,50 |
| P.E. As Somozas | A Coruña | ETAPA A 1-2-3-4 | A | Industrial-comercial | Igvs | 1.900,00 | 40.138,59 | 21,13 | * 20.069,30 | * 10,56 |
| P.E. As Somozas | A Coruña | ETAPA A 1-2-3-4 | B | Industrial-comercial | Igvs | 15.600,00 | 329.558,97 | 21,13 | * 164.779,49 | * 10,56 |
| P.E. As Somozas | A Coruña | ETAPA A 1-2-3-4 | F | Industrial-comercial | Igvs | 32.500,00 | 578.176,06 | 17,79 | * 289.088,03 | * 8,90 |
| P.E. Barco de Valdeorras | Ourense | FASE 2-3 | 207 | Industrial | Igvs | 3.176,00 | 163.627,52 | 51,52 | * 81.813,76 | * 25,76 |
| P.E. Barco de Valdeorras | Ourense | FASE 2-3 | 208 | Industrial | Igvs | 2.935,00 | 151.211,20 | 51,52 | * 75.605,60 | * 25,76 |
| P.E. Barco de Valdeorras | Ourense | FASE 2-3 | 209 | Comercial | Igvs | 4.832,00 | 248.944,64 | 51,52 | * 124.472,32 | * 25,76 |
| P.E. Barco de Valdeorras | Ourense | FASE 2-3 | 212 | Industrial | Igvs | 1.888,00 | 97.269,76 | 51,52 | * 48.634,88 | * 25,76 |
| P.E. Barco de Valdeorras | Ourense | FASE 2-3 | 225 | Industrial | Igvs | 2.707,00 | 139.464,64 | 51,52 | * 69.732,22 | * 25,76 |
| P.E. Barco de Valdeorras | Ourense | FASE 2-3 | 226 | Industrial | Igvs | 4.609,00 | 237.455,69 | 51,52 | * 118.727,84 | * 25,76 |
| P.E. Barco de Valdeorras | Ourense | FASE 2-3 | 229 | Industrial | Igvs | 2.794,00 | 143.946,88 | 51,52 | * 71.973,44 | * 25,76 |
| P.E. Carballiño | Ourense | FASE 2 | 032 | Industrial-comercial | Igvs | 2.158,00 | 88.962,26 | 41,22 | * 44.481,13 | * 20,61 |
| P.E. Cedeira | A Coruña | FASE 1 | 1 | Comercial-terciario | Xestur | 811,00 | 60.825,00 | 75,00 | * 30.412,50 | * 37,50 |
| P.E. Cedeira | A Coruña | FASE 1 | 10 | Industrial-comercial | Xestur | 983,00 | 67.172,33 | 68,33 | * 33.586,17 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 11 | Industrial-comercial | Xestur | 983,00 | 67.172,33 | 68,33 | * 33.586,17 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 12 | Industrial-comercial | Xestur | 983,00 | 67.172,33 | 68,33 | * 33.586,17 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 13 | Industrial-comercial | Xestur | 983,00 | 67.172,33 | 68,33 | * 33.586,17 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 14 | Industrial-comercial | Xestur | 983,00 | 67.172,33 | 68,33 | * 33.586,17 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 15 | Industrial-comercial | Xestur | 983,00 | 67.172,33 | 68,33 | * 33.586,17 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 16 | Industrial-comercial | Xestur | 983,00 | 67.172,33 | 68,33 | * 33.586,17 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 18 | Industrial-comercial | Xestur | 1.320,00 | 90.200,89 | 68,33 | * 45.100,45 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 21 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 22 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 26 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 27 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 28 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 29 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 3 | Comercial-terciario | Xestur | 983,00 | 73.725,00 | 75,00 | * 36.862,50 | * 37,50 |
| P.E. Cedeira | A Coruña | FASE 1 | 30 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 31 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 32 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 33 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 34 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 35 | Industrial-comercial | Xestur | 1.265,00 | 86.442,52 | 68,33 | * 43.221,26 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 36 | Industrial-comercial | Xestur | 1.320,00 | 90.200,89 | 68,33 | * 45.100,45 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 39 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 4 | Comercial-terciario | Xestur | 983,00 | 73.725,00 | 75,00 | * 36.862,50 | * 37,50 |
| P.E. Cedeira | A Coruña | FASE 1 | 40 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 45 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 46 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 47 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 48 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 49 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 5 | Comercial-terciario | Xestur | 983,00 | 73.725,00 | 75,00 | * 36.862,50 | * 37,50 |
| P.E. Cedeira | A Coruña | FASE 1 | 50 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 51 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 52 | Industrial-comercial | Xestur | 1.100,00 | 75.167,41 | 68,33 | * 37.583,71 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 53 | Industrial-comercial | Xestur | 1.265,00 | 86.442,52 | 68,33 | * 43.221,26 | * 34,17 |
| P.E. Cedeira | A Coruña | FASE 1 | 6 | Comercial-terciario | Xestur | 983,00 | 73.725,00 | 75,00 | * 36.862,50 | * 37,50 |
| P.E. Cedeira | A Coruña | FASE 1 | 9 | Industrial-comercial | Xestur | 983,00 | 67.172,33 | 68,33 | * 33.586,17 | * 34,17 |
| P.E. Celanova | Ourense | POLIGONO Nº1 | 204 | Equipamiento social | Igvs | 3.274,00 | 168.550,77 | 51,48 | * 84.275,04 | * 25,74 |
| P.E. Central de Transportes | Ourense | FASE 1 | A3 | Equiq social-comerci | Igvs | 3.332,00 | 227.307,41 | 68,22 | * 113.653,70 | * 34,11 |
| P.E. Central de Transportes | Ourense | FASE 1 | A4 | Equiq social-comerci | Igvs | 3.446,00 | 235.009,64 | 68,20 | * 117.504,82 | * 34,10 |
| P.E. Cervo | Lugo | FASE C | 157 | Industrial | Xestur | 1.224,06 | 64.875,18 | 53,00 | * 32.437,59 | * 26,50 |
| P.E. Cervo | Lugo | FASE C | 158 | Industrial | Xestur | 1.076,51 | 57.055,03 | 53,00 | * 28.527,52 | * 26,50 |
| P.E. Cervo | Lugo | FASE C | 160 | Industrial | Xestur | 1.057,47 | 56.045,91 | 53,00 | * 28.022,96 | * 26,50 |
| P.E. Cervo | Lugo | FASE C | 161 | Industrial | Xestur | 1.057,82 | 56.064,46 | 53,00 | * 28.032,23 | * 26,50 |
| P.E. Cervo | Lugo | FASE C | 162 | Industrial | Xestur | 1.058,20 | 56.084,60 | 53,00 | * 28.042,30 | * 26,50 |
| P.E. Cervo | Lugo | FASE C | 163 | Industrial | Xestur | 1.059,87 | 56.173,11 | 53,00 | * 28.086,56 | * 26,50 |
| P.E. Cervo | Lugo | FASE C | 164 | Industrial | Xestur | 1.248,02 | 66.145,06 | 53,00 | * 33.072,53 | * 26,50 |
| P.E. Lalín 2000 | Pontevedra | FASE 3-AMPLIACION | EQ-S | Equipamiento social | Xestur | 2.008,00 | 200.800,00 | 100,00 | * 140.560,00 | * 70,00 |
| P.E. Lourenza | Lugo | FASE 2 | 11 | Industrial | Igvs | 2.237,13 | 118.948,74 | 53,17 | * 59.474,37 | * 26,59 |
| P.E. Lourenza | Lugo | FASE 2 | 15 | Industrial | Igvs | 1.440,00 | 77.511,44 | 53,83 | * 38.755,72 | * 26,91 |
| P.E. Lourenza | Lugo | FASE 2 | 16 | Industrial | Igvs | 1.140,00 | 61.363,22 | 53,83 | * 30.681,61 | * 26,91 |
| P.E. Lourenza | Lugo | FASE 2 | 17 | Industrial | Igvs | 1.330,00 | 71.590,42 | 53,83 | * 35.795,21 | * 26,91 |
| P.E. Lourenza | Lugo | FASE 2 | EC | Comercial | Igvs | 1.233,81 | 92.274,62 | 74,79 | * 46.137,31 | * 37,39 |
| P.E. Melide | A Coruña | FASE 1 | E-C | Equip-comercial | Igvs | 2.340,00 | 69.496,80 | 29,70 | * 48.647,76 | * 20,79 |
| P.E. Melide | A Coruña | FASE 1 | E-S | Equipamiento social | Igvs | 2.340,00 | 72.135,91 | 30,83 | * 50.495,14 | * 21,58 |
| P.E. Monterroso | Lugo | FASE 1 | C.01 | Comercial | Igvs | 7.207,00 | 194.388,22 | 26,97 | * 97.194,11 | * 13,49 |
| P.E. Monterroso | Lugo | FASE 1 | I.09 | Industrial | Igvs | 790,00 | 18.090,98 | 22,90 | * 9.045,49 | * 11,45 |
| P.E. Monterroso | Lugo | FASE 1 | I.11 | Industrial | Igvs | 790,00 | 18.090,98 | 22,90 | * 9.045,49 | * 11,45 |
| P.E. Monterroso | Lugo | FASE 1 | I.20 | Industrial | Igvs | 5.601,00 | 79.644,90 | 14,22 | * 39.822,45 | * 7,11 |
| P.E. Monterroso | Lugo | FASE 1 | I.21B | Industrial | Igvs | 2.195,00 | 31.991,40 | 14,57 | * 15.995,70 | * 7,29 |
| P.E. Monterroso | Lugo | FASE 1 | I.24 | Industrial | Igvs | 900,00 | 21.640,48 | 24,04 | * 10.820,24 | * 12,02 |
| P.E. Monterroso | Lugo | FASE 1 | I.25 | Industrial | Igvs | 900,00 | 21.640,48 | 24,04 | * 10.820,24 | * 12,02 |
| P.E. Monterroso | Lugo | FASE 1 | I.26 | Industrial | Igvs | 900,00 | 21.640,48 | 24,04 | * 10.820,24 | * 12,02 |
| P.E. Monterroso | Lugo | FASE 1 | I.27 | Industrial | Igvs | 1.160,00 | 22.236,34 | 19,17 | * 11.118,17 | * 9,58 |
| P.E. Monterroso | Lugo | FASE 1 | I.28 | Industrial | Igvs | 1.540,00 | 32.848,50 | 21,33 | * 16.424,25 | * 10,67 |
| P.E. Monterroso | Lugo | FASE 1 | I.29 | Industrial | Igvs | 1.400,00 | 35.034,00 | 25,02 | * 17.517,00 | * 12,51 |
| P.E. Monterroso | Lugo | FASE 1 | I.30 | Industrial | Igvs | 1.400,00 | 35.034,00 | 25,02 | * 17.517,00 | * 12,51 |
| P.E. Monterroso | Lugo | FASE 1 | I.31 | Industrial | Igvs | 1.400,00 | 35.034,00 | 25,02 | * 17.517,00 | * 12,51 |
| P.E. Monterroso | Lugo | FASE 1 | I.32 | Industrial | Igvs | 1.400,00 | 35.034,00 | 25,02 | * 17.517,00 | * 12,51 |
| P.E. Monterroso | Lugo | FASE 1 | I.33 | Industrial | Igvs | 1.400,00 | 35.034,00 | 25,02 | * 17.517,00 | * 12,51 |
| P.E. Monterroso | Lugo | FASE 1 | I.34 | Industrial | Igvs | 1.400,00 | 35.034,00 | 25,02 | * 17.517,00 | * 12,51 |
| P.E. Monterroso | Lugo | FASE 1 | I.35 | Industrial | Igvs | 1.540,00 | 32.848,50 | 21,33 | * 16.424,25 | * 10,67 |
| P.E. Monterroso | Lugo | FASE 1 | I.36-38 | Industrial | Igvs | 2.700,00 | 68.588,42 | 25,40 | * 34.294,21 | * 12,70 |
| P.E. Monterroso | Lugo | FASE 1 | I.37 | Industrial | Igvs | 2.700,00 | 61.729,58 | 22,86 | * 30.864,79 | * 11,43 |
| P.E. Monterroso | Lugo | FASE 1 | I.39 | Industrial | Igvs | 800,00 | 17.037,16 | 21,30 | * 8.518,58 | * 10,65 |
| P.E. Monterroso | Lugo | FASE 1 | I.40 | Industrial | Igvs | 640,00 | 15.821,80 | 24,72 | * 7.910,90 | * 12,36 |
| P.E. Monterroso | Lugo | FASE 1 | I.41 | Industrial | Igvs | 640,00 | 15.821,80 | 24,72 | * 7.910,90 | * 12,36 |
| P.E. Muimenta | Lugo | FASE 1 | D10 | Industrial | Xestur | 2.704,00 | 67.600,00 | 25,00 | * 33.800,00 | * 12,50 |
| P.E. Muimenta | Lugo | FASE1 | P14 | Industrial | Xestur | 900,00 | 73.800,00 | 82,00 | * 36.900,00 | * 41,00 |
| P.E. Muimenta | Lugo | FASE1 | P15 | Industrial | Xestur | 900,00 | 73.800,00 | 82,00 | * 36.900,00 | * 41,00 |
| P.E. Muimenta | Lugo | FASE1 | P16 | Industrial | Xestur | 1.500,00 | 127.500,00 | 85,00 | * 63.750,00 | * 42,50 |
| P.E. Muimenta | Lugo | FASE1 | P17 | Industrial | Xestur | 1.523,00 | 137.070,00 | 90,00 | * 68.535,00 | * 45,00 |
| P.E. Muimenta | Lugo | FASE1 | P18 | Industrial | Xestur | 719,00 | 61.115,00 | 85,00 | * 30.557,50 | * 42,50 |
| P.E. Muimenta | Lugo | FASE1 | P19 | Industrial | Xestur | 719,00 | 61.115,00 | 85,00 | * 30.557,50 | * 42,50 |
| P.E. Muimenta | Lugo | FASE1 | P20 | Industrial | Xestur | 719,00 | 61.115,00 | 85,00 | * 30.557,50 | * 42,50 |
| P.E. Muimenta | Lugo | FASE1 | P21 | Industrial | Xestur | 719,00 | 61.115,00 | 85,00 | * 30.557,50 | * 42,50 |
| P.E. Muimenta | Lugo | FASE1 | P22 | Industrial | Xestur | 719,00 | 61.115,00 | 85,00 | * 30.557,50 | * 42,50 |
| P.E. Muimenta | Lugo | FASE1 | P23 | Industrial | Xestur | 719,00 | 61.115,00 | 85,00 | * 30.557,50 | * 42,50 |
| P.E. Muimenta | Lugo | FASE1 | P25 | Industrial | Xestur | 1.095,00 | 98.550,00 | 90,00 | * 49.275,00 | * 45,00 |
| P.E. Muimenta | Lugo | FASE1 | P29 | Industrial | Xestur | 710,00 | 58.220,00 | 82,00 | * 29.110,00 | * 41,00 |
| P.E. Negreira | A Coruña | FASE 1 | 14 | Industrial-comercial | Xestur | 2.606,00 | 179.814,00 | 69,00 | * 125.869,80 | * 48,30 |
| P.E. Ortigueira | A Coruña | FASE1 | 100 | Industrial-comercial | Xestur | 690,00 | 37.260,00 | 54,00 | * 18.630,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 101 | Industrial-comercial | Xestur | 546,00 | 29.484,00 | 54,00 | * 14.742,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 35 | Industrial-comercial | Xestur | 1.394,00 | 83.640,00 | 60,00 | * 41.820,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 36 | Industrial-comercial | Xestur | 1.400,00 | 84.000,00 | 60,00 | * 42.000,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 37 | Industrial-comercial | Xestur | 1.415,00 | 76.410,00 | 54,00 | * 38.205,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 38 | Industrial-comercial | Xestur | 1.327,00 | 71.658,00 | 54,00 | * 35.829,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 39 | Industrial-comercial | Xestur | 1.273,00 | 68.742,00 | 54,00 | * 34.371,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 40 | Industrial-comercial | Xestur | 1.269,00 | 68.526,00 | 54,00 | * 34.263,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 41 | Industrial-comercial | Xestur | 1.262,00 | 68.148,00 | 54,00 | * 34.074,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 42 | Industrial-comercial | Xestur | 1.337,00 | 72.198,00 | 54,00 | * 36.099,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 43 | Industrial-comercial | Xestur | 1.380,00 | 74.520,00 | 54,00 | * 37.260,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 44 | Industrial-comercial | Xestur | 1.352,00 | 73.008,00 | 54,00 | * 36.504,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 45 | Industrial-comercial | Xestur | 1.250,00 | 67.500,00 | 54,00 | * 33.750,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 54 | Industrial-comercial | Xestur | 1.373,00 | 82.380,00 | 60,00 | * 41.190,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 55 | Industrial-comercial | Xestur | 1.233,00 | 73.980,00 | 60,00 | * 36.990,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 56 | Industrial-comercial | Xestur | 1.233,00 | 73.980,00 | 60,00 | * 36.990,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 57 | Industrial-comercial | Xestur | 1.233,00 | 73.980,00 | 60,00 | * 36.990,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 58 | Industrial-comercial | Xestur | 1.233,00 | 73.980,00 | 60,00 | * 36.990,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 59 | Industrial-comercial | Xestur | 1.233,00 | 73.980,00 | 60,00 | * 36.990,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 60 | Industrial-comercial | Xestur | 1.233,00 | 73.980,00 | 60,00 | * 36.990,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 61 | Industrial-comercial | Xestur | 1.369,00 | 82.140,00 | 60,00 | * 41.070,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 62 | Industrial-comercial | Xestur | 735,00 | 44.100,00 | 60,00 | * 22.050,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 63 | Industrial-comercial | Xestur | 1.284,00 | 69.336,00 | 54,00 | * 34.668,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 64 | Industrial-comercial | Xestur | 1.092,00 | 58.968,00 | 54,00 | * 29.484,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 65 | Industrial-comercial | Xestur | 867,00 | 46.818,00 | 54,00 | * 23.409,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 66 | Industrial-comercial | Xestur | 1.181,00 | 63.774,00 | 54,00 | * 31.887,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 67 | Industrial-comercial | Xestur | 1.115,00 | 60.210,00 | 54,00 | * 30.105,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 68 | Industrial-comercial | Xestur | 1.112,00 | 60.048,00 | 54,00 | * 30.024,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 69 | Industrial-comercial | Xestur | 1.654,00 | 99.240,00 | 60,00 | * 49.620,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 73 | Industrial-comercial | Xestur | 992,00 | 59.520,00 | 60,00 | * 29.760,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 74 | Industrial-comercial | Xestur | 1.098,00 | 65.880,00 | 60,00 | * 32.940,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 75 | Industrial-comercial | Xestur | 1.181,00 | 63.774,00 | 54,00 | * 31.887,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 76 | Industrial-comercial | Xestur | 1.181,00 | 63.774,00 | 54,00 | * 31.887,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 84 | Industrial-comercial | Xestur | 1.053,00 | 56.862,00 | 54,00 | * 28.431,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 85 | Industrial-comercial | Xestur | 857,00 | 51.420,00 | 60,00 | * 25.710,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 86 | Industrial-comercial | Xestur | 1.152,00 | 62.208,00 | 54,00 | * 31.104,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 87 | Industrial-comercial | Xestur | 1.090,00 | 65.400,00 | 60,00 | * 32.700,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 89 | Industrial-comercial | Xestur | 992,00 | 53.568,00 | 54,00 | * 26.784,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 90 | Industrial-comercial | Xestur | 995,00 | 53.730,00 | 54,00 | * 26.865,00 | * 27,00 |
| P.E. Ortigueira | A Coruña | FASE1 | 91 | Industrial-comercial | Xestur | 1.101,00 | 66.060,00 | 60,00 | * 33.030,00 | * 30,00 |
| P.E. Ortigueira | A Coruña | FASE1 | EQ-C | Equip-comercial | Xestur | 2.001,00 | 120.060,00 | 60,00 | * 60.030,00 | * 30,00 |
| P.E. Padron | A Coruña | FASE 1 | 77 | Industrial-comercial | Xestur | 5.880,00 | 323.400,00 | 55,00 | * 226.380,00 | * 38,50 |
| P.E. Pazos-Verín | Ourense | FASE 2.1 | 04 | Industrial-comercial | Igvs | 1.465,48 | 58.074,94 | 39,63 | * 29.037,47 | * 19,81 |
| P.E. Pazos-Verín | Ourense | FASE 2.1 | 05 | Industrial-comercial | Igvs | 2.221,04 | 86.885,70 | 39,12 | * 43.442,85 | * 19,56 |
| P.E. Pontedeume | A Coruña | FASE 1 | EQ-S | Equipamiento social | Igvs | 1.139,00 | 61.292,76 | 53,81 | * 30.646,38 | * 26,91 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | A | Carga fraccionada | Igvs | 7.675,00 | 400.530,97 | 52,19 | * 200.265,49 | * 26,09 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | B1 | Industrial-terciario | Igvs | 938,00 | 69.928,28 | 74,55 | * 34.964,14 | * 37,28 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | B2 | Industrial-terciario | Igvs | 525,00 | 39.138,98 | 74,55 | * 19.569,49 | * 37,28 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | B3 | Industrial-terciario | Igvs | 524,00 | 39.064,42 | 74,55 | * 19.532,21 | * 37,28 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | B4 | Industrial-terciario | Igvs | 525,00 | 39.138,98 | 74,55 | * 19.569,49 | * 37,28 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | B5 | Industrial-terciario | Igvs | 524,00 | 39.064,42 | 74,55 | * 19.532,21 | * 37,28 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | B6 | Industrial-terciario | Igvs | 524,00 | 39.064,42 | 74,55 | * 19.532,21 | * 37,28 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | B7 | Industrial-terciario | Igvs | 986,00 | 73.506,72 | 74,55 | * 36.753,36 | * 37,28 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | C1.1 | Industrial-terciario | Igvs | 6.417,00 | 345.397,63 | 53,83 | * 172.698,81 | * 26,91 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | C1.2 | Industrial-terciario | Igvs | 6.428,00 | 345.989,69 | 53,83 | * 172.994,85 | * 26,91 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | C1.3 | Industrial-terciario | Igvs | 5.704,00 | 307.020,09 | 53,83 | * 153.510,05 | * 26,91 |
| P.E. Porto seco Monforte | Lugo | FASE 1 | E1 | Industrial-terciario | Igvs | 5.441,00 | 308.277,91 | 56,66 | * 154.138,96 | * 28,33 |
| P.E. Ribadavia | Ourense | POLIGONO 1 | 006 | Industrial-comercial | Igvs | 1.098,00 | 103.740,70 | 94,48 | * 51.870,35 | * 47,24 |
| P.E. Ribadavia | Ourense | POLIGONO 2 | 025 | Industrial-comercial | Igvs | 1.032,54 | 97.361,74 | 94,29 | * 48.680,87 | * 47,15 |
| P.E. Ribadavia | Ourense | POLIGONO 2 | DS | Equipamiento social | Igvs | 1.880,32 | 146.315,30 | 77,81 | * 73.157,65 | * 38,91 |
| P.E. Taboada | Lugo | FASE 1 | I.19 | Industrial | Igvs | 1.080,00 | 75.026,40 | 69,47 | * 37.513,20 | * 34,73 |
| P.E. Taboada | Lugo | FASE 1 | I.20 | Industrial | Igvs | 1.080,00 | 75.026,40 | 69,47 | * 37.513,20 | * 34,73 |
| P.E. Taboada | Lugo | FASE 1 | I.21 | Industrial | Igvs | 1.080,00 | 75.026,40 | 69,47 | * 37.513,20 | * 34,73 |
| P.E. Taboada | Lugo | FASE 1 | I.22 | Industrial | Igvs | 1.080,00 | 75.033,08 | 69,48 | * 37.516,54 | * 34,74 |
| P.E. Taboada | Lugo | FASE 1 | I.23 | Industrial | Igvs | 1.080,00 | 75.026,40 | 69,47 | * 37.513,20 | * 34,73 |
| P.E. Vilamarín | Ourense | FASE 1 | 029 | Industrial-comercial | Xestur | 1.672,80 | 110.823,00 | 66,25 | * 55.411,50 | * 33,13 |
| P.E. Vilamarín | Ourense | FASE 1 | 030 | Industrial-comercial | Xestur | 1.741,24 | 115.357,15 | 66,25 | * 57.678,58 | * 33,13 |
| P.E. Vilamarín | Ourense | FASE 1 | 031 | Industrial-comercial | Xestur | 1.810,81 | 119.966,16 | 66,25 | * 59.983,08 | * 33,12 |
| P.E. Vilamarín | Ourense | FASE 1 | 035 | Industrial-comercial | Xestur | 1.033,90 | 68.495,88 | 66,25 | * 34.247,94 | * 33,13 |
| P.E. Vilamarín | Ourense | FASE 1 | 048 | Industrial-comercial | Xestur | 2.806,50 | 185.930,63 | 66,25 | * 92.965,31 | * 33,12 |
| P.E. Vilamarín | Ourense | FASE 1 | 049 | Industrial-comercial | Xestur | 2.806,50 | 185.930,63 | 66,25 | * 92.965,32 | * 33,13 |
| P.E. Vilamarín | Ourense | FASE 1 | 055 | Industrial-comercial | Xestur | 1.338,70 | 88.688,88 | 66,25 | * 44.344,44 | * 33,13 |
| P.E. Vilamarín | Ourense | FASE 1 | 056 | Industrial-comercial | Xestur | 1.633,77 | 108.237,27 | 66,25 | * 54.118,63 | * 33,12 |
| P.E. Viveiro | Lugo | FASE 1 | I.06 | Industrial-comercial | Xestur | 2.863,22 | 214.741,50 | 75,00 | * 107.370,75 | * 37,50 |
| P.E. Viveiro | Lugo | FASE 1 | I.07 | Industrial-comercial | Xestur | 2.634,11 | 197.558,25 | 75,00 | * 98.779,13 | * 37,50 |
| P.E. Viveiro | Lugo | FASE 1 | II.05 | Industrial-comercial | Xestur | 2.158,89 | 161.916,75 | 75,00 | * 80.958,38 | * 37,50 |
| P.E. Viveiro | Lugo | FASE 1 | III.19 | Industrial-comercial | Xestur | 11.545,06 | 808.154,19 | 70,00 | * 404.077,10 | * 35,00 |
| P.E. Viveiro | Lugo | FASE 1 | IV.03 | Industrial-comercial | Xestur | 4.162,40 | 312.180,00 | 75,00 | * 156.090,00 | * 37,50 |
| P.E. Viveiro | Lugo | FASE 1 | IV.05 | Industrial-comercial | Xestur | 2.450,29 | 183.771,75 | 75,00 | * 91.885,88 | * 37,50 |
| P.E. Xermade | Lugo | FASE 2 | 22 | Industrial | Igvs | 600,00 | 10.198,08 | 17,00 | * 5.099,04 | * 8,50 |
| P.E. Xermade | Lugo | FASE 2 | 23 | Industrial | Igvs | 700,00 | 11.897,74 | 17,00 | * 5.948,87 | * 8,50 |
| P.E. Xermade | Lugo | FASE 2 | 29 | Industrial | Igvs | 600,00 | 10.198,08 | 17,00 | * 5.099,04 | * 8,50 |
| P.E. Xermade | Lugo | FASE 2 | 30 | Industrial | Igvs | 600,00 | 10.198,08 | 17,00 | * 5.099,04 | * 8,50 |
| P.E. Xermade | Lugo | FASE 2 | 32 | Industrial | Igvs | 600,00 | 10.198,08 | 17,00 | * 5.099,04 | * 8,50 |
| P.E. Xermade | Lugo | FASE 2 | 33 | Industrial | Igvs | 922,00 | 15.682,76 | 17,01 | * 7.841,38 | * 8,50 |
| P.E. Xermade | Lugo | FASE 2 | 34 | Industrial | Igvs | 1.059,00 | 18.015,58 | 17,01 | * 9.007,79 | * 8,51 |
| P.E. Xermade | Lugo | FASE 2 | 35 | Industrial | Igvs | 1.896,00 | 32.238,66 | 17,00 | * 16.119,33 | * 8,50 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 003 | Industrial-comercial | Xestur | 4.052,00 | 316.056,00 | 78,00 | * 158.028,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 004 | Industrial-comercial | Xestur | 2.879,00 | 224.562,00 | 78,00 | * 112.281,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 005 | Industrial-comercial | Xestur | 2.976,00 | 232.128,00 | 78,00 | * 116.064,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 006 | Industrial-comercial | Xestur | 3.073,00 | 239.694,00 | 78,00 | * 119.847,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 007 | Industrial-comercial | Xestur | 3.171,00 | 247.338,00 | 78,00 | * 123.669,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 008 | Industrial-comercial | Xestur | 3.268,00 | 254.904,00 | 78,00 | * 127.452,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 009 | Industrial-comercial | Xestur | 3.365,00 | 262.470,00 | 78,00 | * 131.235,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 010 | Industrial-comercial | Xestur | 3.463,00 | 270.114,00 | 78,00 | * 135.057,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 011 | Industrial-comercial | Xestur | 3.560,00 | 277.680,00 | 78,00 | * 138.840,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 012 | Industrial-comercial | Xestur | 3.657,00 | 285.246,00 | 78,00 | * 142.623,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 013 | Terciario | Xestur | 5.208,00 | 635.376,00 | 122,00 | * 317.688,00 | * 61,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 014 | Terciario | Xestur | 5.145,00 | 627.690,00 | 122,00 | * 313.845,00 | * 61,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 016 | Industrial-comercial | Xestur | 4.879,00 | 380.562,00 | 78,00 | * 190.281,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 017 | Industrial-comercial | Xestur | 3.452,00 | 269.256,00 | 78,00 | * 134.628,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 018 | Industrial-comercial | Xestur | 3.469,00 | 270.582,00 | 78,00 | * 135.291,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 019 | Industrial-comercial | Xestur | 3.487,00 | 271.986,00 | 78,00 | * 135.993,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 020 | Industrial-comercial | Xestur | 3.504,00 | 273.312,00 | 78,00 | * 136.656,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 021 | Industrial-comercial | Xestur | 3.521,00 | 274.638,00 | 78,00 | * 137.319,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 022 | Industrial-comercial | Xestur | 3.539,00 | 276.042,00 | 78,00 | * 138.021,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 023 | Industrial-comercial | Xestur | 3.556,00 | 277.368,00 | 78,00 | * 138.684,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 024 | Industrial-comercial | Xestur | 3.574,00 | 278.772,00 | 78,00 | * 139.386,00 | * 39,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 025 | Terciario | Xestur | 4.830,00 | 589.260,00 | 122,00 | * 294.630,00 | * 61,00 |
| P.E. Xinzo de Limia | Ourense | FASE 5 | 026 | Terciario | Xestur | 4.893,00 | 596.946,00 | 122,00 | * 298.473,00 | * 61,00 |